期刊文献+

广州珠江新城西塔超高性能混凝土超高泵送及洗管技术 被引量:8

Ultra-high Pumping and Washing Pipe Technology of Ultra-high Performance Concrete in Guangzhou Pearl River New Town West-tower
下载PDF
导出
摘要 广州珠江新城西塔核心筒、外框钢管柱混凝土均使用超高性能混凝土,C90混凝土最高泵送高度167m,C80混凝土最高泵送高度410m,通过多次泵送施工试验和对现场混凝土泵送的分析,根据管道清洗阻力大,弯管多,清洗过程中管道冲击力和噪声大等难点,总结了一套超高性能混凝土超高泵送和洗管技术。重点介绍了泵送和洗管施工工艺。 Core tube and steel frame concrete columns in Guangzhou Pearl River New Town West-tower use ultra-high performance concrete.The maximum pumping height for C90 concrete is 167m,and 410m for C80.By repeating pumping test and on-site concrete construction pumping analysis,according to the washing difficulties of large resistance,many elbow,great impacting force and noise,the authors summarize a set of pumping and washing pipe technology for ultra-high performance concrete.The construction technologies for pumping and washing pipe are introduced in detail.
出处 《施工技术》 CAS 北大核心 2010年第12期17-19,共3页 Construction Technology
关键词 广州珠江新城西塔 超高性能混凝土 超高泵送技术 洗管技术 Guangzhou Pearl River New Town West-tower ultra-high performance concrete ultra-high pumping technology washing pipe technology
  • 相关文献

参考文献8

二级参考文献8

共引文献23

同被引文献41

引证文献8

二级引证文献44

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部