Planning method of infrastructure project in China 被引量:2

Planning method of infrastructure project in China
下载PDF
导出
摘要 Different planning methods have been applied in private and public infrastructure projects, which resulted in different approval procedures and querry about impartiality. However, planning methods of infrastructure projects are seldom investigated up to now. The authors propose a proper project planning method which is applicable to all kinds of infrastructure projects with various funedorigins. The project planning method includes a comprehensive planning frame- work and a six-step planning process. The financial indicator, i. e. , self-reimbursement ratio is introduced for the proper division of financial obligation between government and project company.
出处 《Engineering Sciences》 EI 2010年第4期80-85,共6页 中国工程科学(英文版)
基金 Science Foundation of Jimei University(No.ZQ2007027) Youth Talent Program of Department of Science and Technology of Fujian Province(No.2008F3072)
关键词 China INFRASTRUCTURE implementation scheme PLANNING PROJECT self-reimbursement rate 基础设施项目 项目规划 中国 财务指标 审批程序 目的规划 大肠杆菌 分工
  • 相关文献

参考文献15

  • 1P. R. China National Development and Reform Commission. The guide to feasibility study of investment projects (tentative edition) [Z]. Beijing, 2002. (in Chinese). 被引量:1
  • 2P. R. China State Council. The decision of the State Council on reforming the investment system[Z]. Beijing, 2004. (in Chinese). 被引量:1
  • 3Du Xiangrong, Watanabe T. Problem analysis and recommendation for privately financed infrastructure projects in China [ C ]// Proceeding of the CRICOM 2005 International Research Symposium on Advancement of Construction Management and Real Estate. Hangzhou, China, 2005:530-541. 被引量:1
  • 4Li B, Akintoye A, Edwards P J, et al. The allocation of risk in PPP/PFI construction projects in the UK[J]. International Journal of Project Management, 2005, 23 (1): 23-35. 被引量:1
  • 5Wang S Q, Tiong L K, Ashley D. Evaluation and management of political risks in China' s BOT project[ J]. Journal of Construction Engineering and Management, ASCE, 2000, 126(3), 242-250. 被引量:1
  • 6Shen L Y, Li H, Li Q M. Alternative concession model for build/ operate/transfer eontrae/ projects[ J]. Journal of Construction Engineering and Management, ASCE, 2002, 128(4), 326-330. 被引量:1
  • 7P. R. China State Planning Commission, Ministry of Electric Power and Ministry of Transportation. Notice on questions concerning the administration of examination and approvals for foreign invested concession projects established on trial basis[ Z]. Beijing, 1995. ( in Chinese). 被引量:1
  • 8P. R. China State Planning Commission. Provisional regulations on foreign invested build-operate-transfer projects [ Z ]. Beijing, 1995. (in Chinese). 被引量:1
  • 9P. R. China Ministry of Power Industry. Interim provision and approval procedure on electric power project invested directly by foreigners[ Z]. Beijing, 1996. (in Chinese). 被引量:1
  • 10P. R. China State planning Commission and 5tare Adminlstratmn of Foreign Exchange. Interim administrative measures for project financed by foreign investors[ Z]. Beijing, 1997. (in Chinese). 被引量:1

同被引文献9

引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部