带机器故障的两台机带权误工数排序问题

Minimization of the weighted number of tardy jobs of two parallel machines scheduling with machine disruptions
下载PDF
导出
摘要 讨论机器带故障中断的两台平行机排序问题,工件加工时间均为单位时间,目标是极小化带权误工工件数.当转移时间t=0时给出了最优的算法.当t≠0时,给出了一个多项式时间的近似算法,并证明算法解与最优解至多相差一个带权误工数. The problem of two parallel machines scheduling with machine disruptions is discussed. It is assumed that each job is of unit-length.The goal is to minimize the weighted number of tardy jobs. For the case when the transfer time t = 0,an optimal algorithm is presented.Base on this algorithm, an approximation algorithm for the case when t≠0 is proposed.It is proved that the weighted number of tardy jobs of the latter algorithm is at most one more than that of the optimal solution.
出处 《高校应用数学学报(A辑)》 CSCD 北大核心 2010年第4期393-395,共3页 Applied Mathematics A Journal of Chinese Universities(Ser.A)
基金 国家自然科学基金(11001242 11071220) 浙江省自然科学基金(Y6090554 Y6090175)
关键词 排序算法 机器故障 带权误工数 scheduling algorithm machine disruption weighted number of tardy jobs
  • 相关文献

参考文献8

  • 1唐恒永,赵传立编著..排序引论[M].北京:科学出版社,2002:263.
  • 2Moore J M.An n job,one machine sequencing algorithm for minimizing the number of late jobs[J].Management Science,1968,15:102-109. 被引量:1
  • 3Clausen J,Hansen J,Larsen J,et al.Disruption Management[J].ORMS Today,2001,28:40-43. 被引量:1
  • 4Qi X,Jonathan F,Yu G.Disruption management for machine scheduling:The case of SPT schedules[J].Int J Production Economics,2006,103:166-184. 被引量:1
  • 5严培胜..单机排序的应急管理[D].武汉大学,2005:
  • 6Lee C Y,Leung J T,Yu G.Two machine scheduling under disruptions with transportation considerations[J].Journal of Scheduling,2006,9:35-48. 被引量:1
  • 7叶赛英,沈灏,魏小兰.机器带故障的两台机排序问题的一个近似算法[J].杭州电子科技大学学报(自然科学版),2008,28(2):90-92. 被引量:3
  • 8Lawler E L.Sequencing to minimize the weighted number of tardy jobs[J].RAIRO Operations Research,1976,10:27-33. 被引量:1

二级参考文献4

  • 1Moore J M. An n job One machine sequencing algorithm for minimizing the number of late jobs[J]. Management Science, 1968,15 (3) : 102 - 109. 被引量:1
  • 2Lee Chung - Yee, Yu G. Single machine scheduling under potential disruption[J]. Operations Research Letters,2006, (10): 1 - 8. 被引量:1
  • 3陈秋荣.排序的理论与方法[M].武汉:华中理工大学出版社,1986:1-50. 被引量:1
  • 4Lee Chung- Yee,Leung Joseph Y- T, Yu Gang. Two machine scheduling under disruptions with transportation considerations [J]. Journal of Scheduling, 2006, (9) :35 - 48. 被引量:1

共引文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部