摘要
就泄洪洞工作闸门局部开启的情况进行数值模拟计算,对泄洪洞出流处底掺气空腔长度与试验进行校核。
Discharge tunnel is commonly used facilities,the working gate partial opening has also become increasingly common,this case turned on the partial opening numerical simulation,the office of the discharge tunnel outflow end of the cavity length of the aerated checked with the test,and it has reached numerical significance.
出处
《水利科技与经济》
2010年第11期1245-1247,共3页
Water Conservancy Science and Technology and Economy
关键词
泄洪洞
局部开启
数值计算
discharge tunnel
partial opening
numerical calcultion