向家坝地下电站蜗壳不同埋设方式的比较分析

Comparison Analysis on Spiral Case Structure with Different Embedding Types in Xiangjiaba Underground Power Station
下载PDF
导出
摘要 大型机组蜗壳通常采用保压、垫层、直埋3种埋设方式,结合向家坝地下电站工程实际,通过不同蜗壳埋设方式对比计算分析,给出了一种适合该地下电站机组特点的直埋、垫层组合埋设方案。计算结果表明:组合方案具有混凝土应力分布均匀、拉应力值不大,能够充分发挥混凝土联合承载作用等优点,可作为推荐方案。 The spiral case of large hydraulic unit usually adopts three different embedding types including pressure preservation,cushion layer and direct embedment.In combination with the project of Xiangjiaba Underground Power Station,a combining scheme of the embedded directly spiral case with a cushion layer is given,which can be fit in features of this hydraulic unit.The results showed that the combining scheme can be recommended,which have the advantages of more uniform distribution of stress,less tensile stress and jointly bearing load with concrete.
出处 《长江科学院院报》 CSCD 北大核心 2010年第12期72-75,共4页 Journal of Changjiang River Scientific Research Institute
基金 中央级公益性科研院所基金(CKSF0210012)
关键词 蜗壳 埋设方式 有限元法 spiral case embedding type finite element method(FEM)
  • 相关文献

参考文献5

二级参考文献1

  • 1西北勘测设计研究院.DL/T 5057-1996水工混凝土结构设计规范[S].北京:中国电力出版社,1997. 被引量:1

共引文献37

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部