1Neuhaus,U.,Gunther, H..O.,Gur,B.,YangoG..An MILP model for flexible block planning in make-and-pack production[J]. Proceedings of the 4thAsian Pacific Conference on Industrial Engineering and Management Systems,2002(4):375-378. 被引量:1
2Soman,C.A.,van Donk,D.P.,Gaalman,G.J.C.A basic period approach to the economic lot scheduling problem with shelf life considerations[J].International Journal of Production Research, 2004(8):1677-1689. 被引量:1
3Chang, Y and R.W. Hartil. measurement of air cell distribution in dairy foams. Int, Dairy J. 2002,12 (5):463-472. 被引量:1
4Donohowe, D.P,R.W, Hartel, and R. L.Bradley, Jr.Determination of ice crystal size distribution in frozen desserts Dairy Sci. 1991,74:3334-3344. 被引量:1
5Keeney, P. G and D.V. Josephson. A measure of the fat stability in ice cream and its relationship to dryness, lce cream trade J. 1958,54(5):32-34,36. 被引量:1