期刊文献+

刘家峡水电站混凝土建筑物耐久性分析 被引量:8

Concrete Structures Durability Analysis of Liujiaxia Hydropower Station
下载PDF
导出
摘要 刘家峡水电站混凝土主、副坝和溢洪道、泄水道、泄洪洞、排沙洞已运行40余年,对混凝土裂缝、表层碳化、渗漏溶蚀、冻融冻胀、水质侵蚀、混凝土强度和冲磨空蚀等方面的全面检测分析表明,这些混凝土建筑物耐久性较好。指出封闭渗漏入口以提高坝体防渗能力,是防止或减缓渗漏溶蚀、冻融冻胀破坏的有效措施,并应密切关注坝前水沙动态变化趋势,对冲磨空蚀破坏及时进行修补处理,以增强耐久性。 The main and auxiliary dam,spillway,discharge conduit and tunnel,and desilting tunnel of Liujiaxia Hydropower Station have operated for 40 years.The analysis on concrete cracks,surface carbonation,infiltration dissolution,freeze-thaw frost heave,water erosion,concrete strength and cavitation show that the durability of concrete structures is better.The closure of seepage entrance to increase dam anti-leakage capacity is an effective measure to prevent or slow the infiltration dissolution and freeze-thaw frost heave,and the timely repair of cavitation damage can also enhance the durability.
出处 《水力发电》 北大核心 2010年第3期39-42,共4页 Water Power
关键词 混凝土建筑物 耐久性 刘家峡水电站 concrete structure durability Liujiaxia Hydropower Station
  • 相关文献

参考文献5

二级参考文献2

共引文献37

同被引文献115

引证文献8

二级引证文献37

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部