混凝土坝初期水管冷却方式研究 被引量:9

Research on the Initial Pipe Cooling Method of Concrete Dam
下载PDF
导出
摘要 从混凝土坝温度应力控制的全局出发,系统地研究了初期水管冷却方式对温度应力的影响,考虑两种冷却方式:一种是恒水温冷却,在整个初期冷却期间采用恒定水温;一种是变水温冷却,即初期冷却分为两阶段,分别采用不同水温。算例计算结果表明,当水管间距为1.5 m×1.5 m时,如间歇时间为5~10 d,以恒水温冷却为优;如果间歇时间为20 d,则以变水温冷却为好。当水管间距为1.5 m×0.75 m时,则变水温冷却为宜。 The influences of two initial pipe cooling methods on the thermal stress of concrete dam are studied herein.The first method uses constant temperature cooling water in the initial cooling period.The second method uses two different temperature cooling water in the first and second stage of the initial cooling period respectively.The example calculation shows that: for water pipes with spacing of 1.5 m × 1.5 m,the first method is better if the intermittent time is 5~10 d and the second method is better if the intermittent time is 20 d;for water pipes with spacing of 1.5 m × 0.75 m,the second method is better.
出处 《水力发电》 北大核心 2010年第3期31-35,共5页 Water Power
基金 国家科技支撑计划项目(2008BAB29B05) 水利部行业公益科研专项项目(200801007)
关键词 混凝土坝 初期水管冷却 冷却方式 温度应力 concrete dam initial pipe cooling cooling method thermal stress
  • 相关文献

参考文献5

二级参考文献7

共引文献97

同被引文献190

引证文献9

二级引证文献39

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部