对工程建设项目前期调研、设计、施工、竣工验收各阶段的投资管理与控制进行了阐述,指出在项目前期要充分调研,确定合适的建设规模及建设标准,同时要推行限额设计,在施工中严格设计变更,还需建立严格审计制度,从而把工程投资控制在概算范围内。
The engineering construction project earlier period investigation and study, the design, the construction, completion approved various stages the investment management and controls has carried on the elaboration, it points out must investigate and study fully in the project earlier period, determined that the appropriate construction scale and the construction standard, simultaneously needed to carry out the quota design, in construction strict design alteration, and must establish the strict auditing system, so as to project investment control in budgetary estimate scope.
出处
《山西建筑》
2010年第36期255-256,共2页
Shanxi Architecture
关键词
建设项目
阶段
投资
控制
building project, stage, investment, control