摘要
针对聚氯乙烯干燥过程的大纯滞后特点,介绍了实现Smith预估补偿和增益预估补偿控制的方法,并就现场投运的实际情况作出具体的分析比较。
According to the long time delay in the process of drying polyvinyl chloride, this paper introduces realizationofthe method of Smith predictor and amplification compensation,and gives the analysis and comparison in detail on the basis of the on the spot situation in application of the method
出处
《青岛化工学院学报(自然科学版)》
1999年第1期69-74,共6页
Journal of Qingdao Institute of Chemical Technology(Natural Science Edition)