摘要
主要研究各种可行装配顺序的评价方法.提出了装配层状关系模型,讨论了装配作业时间的计算方法,提出了从装配生产调度的角度来评价装配顺序的方法。
The purpose of this research is to objectively evaluate the differences among the feasible assembly sequences. For this purpose an assembly hierarchy relational model is proposed. The calculation of the operating time based on the predetermined time standards is discussed. A evaluation method of assembly sequences with considering production schedule is proposed. An example of assembly sequences evaluation for cylindrical spur gearbox is given.
出处
《东南大学学报(自然科学版)》
EI
CAS
CSCD
1999年第2期38-43,共6页
Journal of Southeast University:Natural Science Edition
基金
国家"863"CIMS主题资助
关键词
装配规划
装配顺序
评价
装配模型
生产调度
assembly planning
assembly sequence evaluation
assembly model
production schedule