摘要
通过对上海东海大桥海上风电场的选址、风电场升压方式、基础选型设计、桩基试验、基础施工、风机安装等技术问题的研究和实践,提出了海上风电场选址原则、接入电网方式、具有防撞能力的高桩混凝土承台基础形式、风机基础结构分析方法、桩的承载力试验手段、高桩承台施工和风机整体吊装方案等,为海上风电场规划建设提供借鉴。
The paper presented the principle to offshore wind farm siteselection, the technique to connect with the power grid, the foundation type of high - piled concrete bearing platform with anticollision ability, the analysis method of wind turbine foundation structure, the test means of the pile' s bearing capacity, the scheme to high piled bearing platform construction and wind turbine integral lifting , etc. The above outcomes are achieved by study on some technical issues and certain practice including the site selection, the voltage elevation method employed in the wind farm, the design of foundation type selection, the test of pile foundation, the foundation construction, the erection of wind turbine , etc. for Shanghai Donghai Bridge Offshore Wind Farm. They are worth recommending for reference for the planning and construction of offshore wind farm in the future.
出处
《中国工程科学》
2010年第11期19-24,共6页
Strategic Study of CAE
基金
上海市科技创新行动计划项目(08DZ1200603)
关键词
海上风电场
规划选址
升压方式
基础设计与施工
风机安装
offshore wind farm
site selection
voltage elevation method
design and construction of foundation
erection of wind turbine