摘要
讨论了配合抽水蓄能电站的火电系统发电计划.分析了机组的优化投运序列,并对火电机组作了边际成本分析.
The generation scheduling of thermal power system with pumped-storage station is discussed. The optimal operation array of thermal power unit is analyzed. And the analysis of themarginal units is given.Wang Minyou Assoc. Prof.; Shanghai Jiao Tong University, Shanghai 200030,China.
出处
《水电能源科学》
1999年第2期66-68,共3页
Water Resources and Power