摘要
以南宁市轨道一号线试点站场综合交通工程为例,针对当前城市轨道站点施工期间普遍存在的交通问题,深入研究其施工方案的选取、交通疏解思路和具体疏解方案的制订等问题,并运用TSIS仿真软件对其疏解方案进行分析,以证明方案的可行性,为我国城市轨道站点施工期间如何较好地解决城市交通问题提供借鉴思路。
Through project case organization scheme for solution to urban rail transit station, and shows the paper proposes traffic evacuation existing problems during construction of ts feasibility by simulation analysis.
关键词
南宁市
轨道站点
交通疏解
Nanning city
rail transit station
traffic evacuation organization