摘要
根据井筒的技术特征及工程、水文地质情况,通过采用先进的施工技术、合理的施工工艺、可靠的大型机械化综合配套装备以及精心的组织和科学的管理,实现了井筒快速、安全、优质高效的施工,取得了月成井134m的好成绩。这些关键技术在工程实践中的应用,为深立井井筒施工积累了一定经验。
According to the shaft of the technical features and engineering,hydrogeological conditions,through the use of advanced construction technology,construction technology and reasonable,reliable and comprehensive supporting large-scale mechanized equipment,and careful organization and scientific management,to achieve a shaft fast,safe,high quality efficient construction,and achieved a good month as well 134 mresults.These key technologies applied in engineering practice,for the deep vertical shaft construction has accumulated some experience.