摘要 随着能源需求的不断增加,国内管道建设处在一个新的高潮时期,受各种因素制约,近距离并行敷设管道越来越多,给管道的建设和运行安全带来了新的挑战。通过分析并行管道设计、建设和运行阶段所面临的风险因素以及现有研究状况,并着重对管道运行阶段事故交互影响的失效概率进行了讨论。最后提出,对于并行管道的安全问题,不仅要考虑失效后果的严重程度,也应考虑管道发生事故后产生交互影响的概率问题,有效降低管道失效概率是解决并行管道安全问题的主要途径。 Due to the rapid increase of energy demand,parallel pipelines construction in China has entered a new stage and become more and more common.It will bring problems in pipelines safety at design,construction and operational phases.The risk and failure probability of parallel pipelines are analyzed.A viewpoint is provided that not only the consequence of failure but also the interaction failure probability should be considered in analyzing the parallel pipeline risk,and that the main method to solve the problem in pipelines safety is to reduce the failure probability effectively.
出处 《管道技术与设备》 CAS 2010年第5期52-55,共4页 Pipeline Technique and Equipment
基金 国家科技支撑计划课题(2008BAB30B03)
关键词 并行管道 风险 失效概率 后果 交互影响 parallel pipelines risk failure probability consequence interaction
  • 相关文献

参考文献8

  • 1BYRD W R.Best Practices in Damage Prevention for Parallel Construction Projects.International Pipeline Conference,Calgary,Alberta,Canada,September 29-October 3,2008. 被引量:1
  • 2SMITH T M,AHINGA Z,WHITE C T,et al.Design of parallel pipelines.ASCE National Conference on Environmental and Pipeline Engineering,Kansas City,Missouri,Jul 23-26,2000:419-428. 被引量:1
  • 3FRANCINI R B,BALTZ W N.Blasting and Construction Vibrations Near Exiting Pipelines,What Are Appropriate Levels.International Pipeline Conference,Calgary,Alberta,Canada,September 29-OcTober 3,2008. 被引量:1
  • 4ESPARZA E D,WESTINE P S,WENZEL A B.Pipeline Response to Buried Explosive Detonations,Volumes I and II.PRCI Catalog No.L51406,PRCI,Arlington,VA,1981. 被引量:1
  • 5Pipeline Research Council International.Line Rupture and the Spacing of Parallel Lines,2002. 被引量:1
  • 6ZHOU X X,LEA C J,BILO M,ET al.Three-dimensional computational fluid dynamic modeling of natural gas releases from high-pressure pipelines.Pipes&pipelines International,1997:13-25. 被引量:1
  • 7CALLIN C A,LEA C J,BILO M,et al.Computational fluid dynamic modeling of natural gas releases from high-pressure pipelines subject to guillotine,tear,or puncture failures.Pipes&Pipelines International,1998:12-27. 被引量:1
  • 8PIRAMID Technical Reference Manuals.C-FER Technologies,Inc,2003. 被引量:1