基于采矿环境再造的注浆构造人工矿柱试验与监测 被引量:3

Study on Grouting Construction Technology for Artificial Pillar Based on Mining Environment Reconstruction and Continuous Caving Method
下载PDF
导出
摘要 介绍了采矿环境再造连续采矿嗣后充填采矿法中构筑人工矿柱的新方法。根据云锡公司卡房多金属新山矿段实际采空区的尺寸按比例设计了模拟采空区,开展了人工矿柱半工业试验,对人工矿柱半工业试验进行了检测。地质雷达检测和声波仪测试结果表明,利用注浆技术构筑人工矿柱技术与工艺具有可行性,能够达到设计要求,为井下进行充填采矿提供了科学依据。 Based on mining environment reconstruction by continuous mining and afterwards backfilling mining method,a new method of constructing artificial pillar was introduced.With a simulated goaf designed in proportion to the real size of the mind-out area in Kafang multi-metallic Xinshan ore section of Yunxi Company,a pilot experiment was performed for artificial pillar.Geology radar and sonic wave tests results show that the artificial pillar constructed by grouting technology is feasible in terms of technique and technology,all meeting the designing requirements,which can be taken as a scientific basis for underground mining with backfilling.
出处 《矿冶工程》 CAS CSCD 北大核心 2010年第5期5-8,共4页 Mining and Metallurgical Engineering
基金 云南省科技强省计划(2007AD004)
关键词 采矿环境再造 人工矿柱 地质雷达测试 声波测试 充填注浆 mining environment reconstruction artificial pillar geology radar test sonic wave test grouting filling
  • 相关文献

参考文献8

二级参考文献8

共引文献262

同被引文献12

引证文献3

二级引证文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部