摘要
龚嘴水电站机组进水口拦污栅在使用中经常被飘浮污物堵塞,为此对拦污栅结构进行了改造,提高其过流和抗堵能力。
The intake trash rack of Gongzui Hydropower Station was often blocked by the floating trash in operation.The reformation for the rack structure was carried out.The discharge and anti-blocking capacity have been improved.
出处
《水电与新能源》
2010年第5期18-19,共2页
Hydropower and New Energy