摘要
结合工程实际,论述了高压燃气管道不停输封堵施工的方案选择、盘式封堵施工工艺、施工过程的环节控制,提出了改进建议。
Combined with a practical project, the scheme selection of plugging construction without interruption of service for high-pressure gas pipeline, the cup-type plugging construction process and the link control during the construction are described, and some improvement suggestions are made.
出处
《煤气与热力》
2010年第9期27-31,共5页
Gas & Heat
关键词
高压燃气管道
不停输作业
盘式封堵
high-pressure gas pipeline
without interruption of service
cup-type plugging