摘要
以湖州市某污水处理厂扩建工程为例,结合工程场地地质概况,通过对厂区地基处理方案,进行综合分析比较,确定了采用PC管桩处理方案并作了具体阐述,指出了施工中应注意的问题,经实践证明,采用PC管桩处理地基加固效果良好。
Taking the expansion project for some sewage treatment plant in Huzhou as an example, the paper combining with field geological survey of project, undertakes the comprehensive analysis and comparison for the foundation treatment scheme in the area, identifies the PC pipe pile treatment scheme and has the concrete illustration, points out some precautions, and proves the adoption of the PC pipe pile for the treatment of foundation is effective.