摘要
目前水轮发电机尚没有所谓的"电位外移"测试方法和标准,本文通过介绍消除瑞丽江一级电站6号机绕组泄漏电流不平衡现象的过程,为以后解决水轮发电机定子绕组三相泄漏电流不平衡或者偏大问题提供了参考。
So far, there is no test method and standard for the so-called"potential movement method"for hydrogenerator. The paper introduces the course of eliminating the imbalanced leakage current of No6 generator in Ruilijiang station. It provides reference for solving three phase leakage current imbalance in the future.
出处
《大电机技术》
北大核心
2010年第5期1-5,62,共6页
Large Electric Machine and Hydraulic Turbine
关键词
绕组端部手包绝缘
表面电位
直流耐压
泄漏电流
不平衡
hand-making insulation at stator end-winding
surface potential
DC testing
leakage current
imbalance