麦洛维大坝工程基础处理,主要包括左右岸混凝土面板堆石坝趾板及厂房进水口、溢流坝、非溢流坝坝段等的固结、帷幕灌浆,左岸粘土心墙坝防渗墙施工,溢流坝段护坦及消力池部分连锁桩墙施工。这些基础工程在施工时分别采用了相应的较先进设备,施工成果达到设计标准,满足了国际工程的需要。
MEROWE Dam Project foundation treatment mainly includes consolidation and grouting in the concrete slab and rock-ill dam toe slab in left/right bank, power house intake, spillway, non-overflow section etc. , construction of cut-off wall of clay core dam in left bank, construction of secant pile wall in spillway apron & stilling basin. Some advanced equipments were used in the foundation treatment. The construction result reached the design standard and meet the need of international project.
出处
《南水北调与水利科技》
CAS
CSCD
2010年第A01期50-53,共4页
South-to-North Water Transfers and Water Science & Technology
关键词
麦洛维大坝工程基础处理
灌浆
防渗墙
连锁桩墙
设备
国际工程
MEROWE DAM Project foundation treatment grouting cut-off wall
secant pile wall,
equipment international project