新加坡地铁环线C824标段失事后的修复重建(一)--修复方案的比选与确定 被引量:2

Recovery Work of Singapore MRT Circle Line C824 Nicoll Highway Collapse(Part I)——Comparison and Assessment of Recovery Options
下载PDF
导出
摘要 2004年4月20日下午3:30,新加坡地铁环线C824标段的一段明挖区间隧道在开挖至第10道支撑(约33 m深度)的时候出现了坍塌事故。事故造成了约100 m左右区间隧道围护体系的彻底崩溃,4人死亡,紧邻的Nicoll大道下陷以及周边一些城市生命管线严重损毁。事故发生后在对事故原因进行调查的同时,修复方案的论证工作也在同步进行。修复方案主要在原位修复和改线修复两种方案之间比较,在综合考虑工程本身的难度与风险、对周边环境的影响、工期与造价等多方面的因素后而最终选定改线方案。文章重点介绍了原位方案与改线方案的一些技术要点,其姊妹篇"新加坡地铁环线C824标段失事后的修复重建(二)"则重点介绍修复方案的具体实施情况。 At approximately 3:30 pm on 20th April 2004,a 33 m deep excavation reaching the 10th strut level as a part of cut and cover tunnel in C824 Singapore MRT collapsed.This collapse claimed 4 lives and resulted in the loss of some 100 m of braced excavation,some utilities such as gas pipe line,66 kV cable were damaged seriously.The intensive incident causation investigation and comprehensive study and assessment on recovery work were carried out simultaneously right after the collapse.The assessment and in depth study for recovery works were focused on two options,namely keeping existing line and realignment.Based on in depth consideration of a number of critical issues such as technical difficulties and risks,environmental impact,construction duration and cost etc.,realignment recovery option was chosen finally.The crucial technical points of these two options were addressed in this paper.The implementation of realignment option will be introduced in companion volume "Recovery Work of Singapore MRT Circle Line C824 Nicoll highway Collapse(Part II)".
出处 《现代隧道技术》 EI 北大核心 2010年第4期62-67,79,共7页 Modern Tunnelling Technology
关键词 坍塌 修复 明挖 地下连续墙 钻孔桩连续壁 TBM掘进 Nicoll highway collapse Recovery work Cut and cover Diaphragm wall Continuous bored piles TBM driving
  • 相关文献

参考文献10

二级参考文献21

  • 1COI (2005), Report of the Committee of Inquiry into the incident at the MRT circle line worksite that led to collapse of Nicoll Highway on 20 April 2004[R], Ministry of Manpower, Singapore. 被引量:1
  • 2A.J. Whittle, Nicoll Highway Collapse: evaluation of geotechnical factors affecting design of excavation support system [C], International Conference on Deep Excavations 28-30 June 2006, Singapore. 被引量:1
  • 3R.V.Davies, S.T.Poh, Nicoll Highway Collapse: field measurements and observations [C], International Conference on Deep Excavations 28N30 June 2006, Singapore. 被引量:1
  • 4S.P. Chiew, B.C.Bell Nicoll Highway Collapse - Some structure observations: Part 1 - Strut Waler connection [C], International Conference on Deep Excavations 28-30 June 2006, Singapore. 被引量:1
  • 5B.C.Bell S.P. Chiew, Nicoll Highway Collapse - Some structure observations: Part 2 - Soil Retaining system [C], International Conference on Deep Excavations 28-30 June 2006, Singapore. 被引量:1
  • 6BS5950 Part Ⅰ: 1990. Structure use of steelwork in buildings: Part Ⅰ: Code of practice for design in simple welded sections. British Standards Institution, London, UK. 被引量:1
  • 7BS5950 Part Ⅰ: 2000. Structure use of steelwork in buildings: Part Ⅰ: Code of practice for design - rolled and welded sections. British Standards Institution, London, UK, May 2001. 被引量:1
  • 8COI (2005). Report of the Committee of Inquiry into the incident at the MRT circle line worksite that led to collapse of Nicoll Highway on 20 April 2004[R]. Ministry of Manpower, Singapore. 被引量:1
  • 9A.J. Whittle. Nicoll Highway Collapse: evaluation of geotechnical factors affecting design of excavation support system[C]. International Conference on Deep Excavations 28-30 June 2006, Singapore. 被引量:1
  • 10R.V.Davies, S.T.Poh. Nicoll Highway Collapse: field measurements and observations[C]. International Conference on Deep Excavations 28-30 June 2006, Singapore. 被引量:1

共引文献36

同被引文献24

  • 1董焰,单连龙.中国城市轨道交通未来十年发展趋势及政策导向[J].城市轨道交通研究,2004,7(3):6-9. 被引量:27
  • 2朱军.我国城市轨道交通发展现状与对策建议[J].城市轨道交通研究,2005,8(6):11-14. 被引量:54
  • 3杨立新,韩英姿.城市轨道交通的建设理念及其实现[J].城市轨道交通研究,2006,9(2):18-21. 被引量:7
  • 4A.J. Whittle, Nicoll Highway Collapse: Evaluation of Geotechnical Factors Affecting Design of Excavation Support System [C]. International Conference on Deep Excavations 28-30 June 2006, Singapore. 被引量:1
  • 5R.V. Davies, S. T. Poh, Nicoll Highway Collapse: Field Measurements and Observations [C]. International Conference on Deep Excavations 28-30 June 2006, Singapore. 被引量:1
  • 6S.P. Chiew, B. C. Bell Nicoll Highway Collapse- Some Structure Observations: Part 1 - Strut Waler Connection [C]. International Conference on Deep Excavations 28-30 June 2006, Singapore. 被引量:1
  • 7B. C. Bell S.P. Chiew, Nieoll Highway Collapse - Some Structure Observations: Part 2 - Soil Retaining System [C]. International Conference on Deep Excavations 28-30 June 2006, Singapore. 被引量:1
  • 8N. H. Osborne, C.C. Ng, Strut Omission by Observational Approach for Deep Excavation in Singapore using Hybrid Ground Treatment [C]. International Conference on Deep Excavations 28-30 Dec. 2008, Singapore. 被引量:1
  • 9L. L. Ong, N. H. Osborne & C.C. Ng, Risk Management for Bored Tunnel Sump Pit Construction in Challenging Ground Condition [C]. International Conference on Deep Excavations 28-30 Dec. 2008, Singapore. 被引量:1
  • 10唐业清.深基坑工程事故的预防与处理[J].施工技术,1997,26(1):4-5. 被引量:27

引证文献2

二级引证文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部