摘要
以尼尔基水利枢纽工程为例,着重介绍设计阶段的投资控制实例,详细分析主坝基岩取消部分灌浆帷幕,主坝软弱夹层部位取消压重,正常蓄水位确定,对尼尔基工程控制投资起关键作用。
This paper emphatically introduces the example of investment control in the design stage of Nierji hydro-junction project. The cancellation of part grout curtain in main dam foundation, the cancellation of weight in the weak intercalation of main dam, and the determination of normal pool level play a key role in the investment control of Nierji hydro-junction project.