摘要
建议:一、将资源/储量核实报告中消耗的资源量不赋予资源/储量类别,用消耗二字拼音的首字母"XH"来代替;但应说明消耗的是原"报告"中什么类别的资源/储量及本次工作各类资源/储量的变化情况。二、地质报告中"矿体"的划分应根据成矿时有用矿物聚积体的赋存状态来划分,而不是以现在的存在方式来划分;三、勘查线剖面的终点应标注在倾斜方向或按左东右西的原则标注在方位角小的端点处,方位为正北时取360°。
In this paper,three suggestions is given: first is not make the consumption in the resource or reserve verification endow with the resource or reserve type,replace them with the initial 'XH';but it should know that what kind of resource or reserve the consumption in the report and the changing condition of each kinds of resource or reserve: second is the division of the 'ore body' in the report should depends on the occurrence of useful mineral concentration when mining,but not the present existing way;three is the end point of the prospecting line sector should be marked on the descent direction or the end where the azimuth is small as the principle east west.take 360° when the orientation is due north.
出处
《贵州地质》
2010年第2期116-117,共2页
Guizhou Geology
关键词
消耗资源量
矿体
划分
勘查线剖面端点
标注
consumption resource
ore body
division
prospecting line sector
mark