摘要
结合国家体育场工程概况,论述了该项目桩基施工质量监理控制方法,从事前控制、过程控制、事后控制三方面具体介绍了该工程桩基施工的监理控制措施,从而保证了整个桩基础的施工质量。
By combining with the survey of the project in National Gymnasium,the paper indicates the control methods for the construction quality of the pile foundation of the program,and introduces the supervision measures for the pile foundation construction of the project from the advance control,the process control,and the afterward control,so as to ensure the construction quality of the whole pile foundation.
出处
《山西建筑》
2010年第25期227-228,共2页
Shanxi Architecture
关键词
体育场
桩基
监理控制
控制效果
gymnasium
pile foundation
supervision control
control effect