摘要
结合保沧高速K14+530.54~K15+629段落支挡防护工程加筋挡土墙工程建设实例,从面板安装、填料摊铺与压实等方面详细阐述了加筋挡土墙的施工工艺以及质量控制措施,以期对类似项目施工具有一定指导意义。
Combining with the specific example,reinforced earth-retaining wall project construction in supporting,retaining and prevention project on Bao-Cang highway K14+530.54~K15+629 section,the thesis expounded the construction technologies and quality control measures of the reinforced earth-retaining wall from the aspects: the installment of the face slab,filler paving and compaction etc.,expecting to have certain guiding senses to the similar item constructions.