摘要
型钢厂加热炉风机电气控制系统的改造,解决了原有设备浪费电能的问题,同时也完成了自动控制频率,从而保证了加热炉风机的稳定运行,增加了节约电能的效率,并且为生产带来了很好的效益。
The electrical control system for heating furnace blower of the Profile Steel Plant was transformed,which settled the issue of wasting electric energy of the original equip-ment,and automatic control of frequency was achieved.It guaranteed stable running of the heating furnace blower,increased efficiency of electric energy saved and produced good eco-nomic benefits.
出处
《冶金动力》
2010年第4期16-17,共2页
Metallurgical Power
关键词
风机
软起动器
加热炉
变频器
blower
soft starter
heating furnace
frequency converter