交流特高压GIS变电站的VFTO研究 被引量:6

Study on VFTO of AC Ultra-high Voltage GIS Substation
原文传递
导出
摘要 指出特高压GIS系统的特快速暂态过电压会对GIS主绝缘及主变构成威胁。介绍了通过EMTP仿真软件建立的3/2台断路器主接线方式的特高压晋东南GIS变电站远景时期模型,计算投切主变、出线和母线可能产生的最大VFTO。认为投切主变可能产生的最大VFTO达2.51 p.u.,会对GIS本体主绝缘和主变匝间绝缘构成严重危害,投切出线和母线产生的VFTO对GIS本体主绝缘和主变匝间绝缘不构成危害。指出对于3/2台断路器主接线方式,遵循常规操作顺序,彻底消除投切主变产生的VFTO的措施。 The very fast transient overvoltage(VFTO) of the ultra-high voltage GIS system may pose the threats to the GIS main insulation and the main transformer.The southeastern Shanxi ultra-high GIS substation prospective time model of the connection mode of a 3/2 circuit breaker was built with the EMTP simulation software.The possible maximum VFTO produced by switching the main transformer,outgoing line and bus line was calculated.The possible maximum VFTO produced by switching the main transformer was estimated to reach 2.51 p.u.,which will cause severe damages to the main insulation and interturn insulation of the GIS.However,the VFTO produced by transferring outgoing line and bus line will not cause any damage.The measures of following the normal operating sequences and completely eliminating the VFTO produced by transferring the main bus for the 3/2 circuit breaker were indicated.For the ultra-high voltage substation,the disconnector should be separated after separating the high and low circuit breakers in the two sides of the main transformer.For the large-scale power plant,it was suggested to install the generator circuit breaker(GCB) and separate the GCB and the circuit breaker in the high-voltage side of the main transformer followed by separating the disconnector.By these measures,the VFTO produced by operating the main transformers in ultra-high voltage substation and large-scale power plant can be eliminated completely,ensuring the safety of the main insulation of the GIS ontology and the interturn insulation of the main transformer.
出处 《华东电力》 北大核心 2010年第7期1043-1047,共5页 East China Electric Power
关键词 特快速暂态过电压 交流特高压 GIS变电站 投切操作主变压器 ulta-high voltage GIS VFTO disconnector main transformer operation GCB
  • 相关文献

参考文献12

二级参考文献29

  • 1何善庆.GIS中的快速暂态现象[J].高压电器,1995,31(2):41-46. 被引量:52
  • 2张纬钹,电力系统过电压与绝缘配合,1988年 被引量:1
  • 3Povh D,Schmitt H,Valcker O.Modeling and analysis guidelines foe very fast transients[J].IEEE Trans on PWRD,1996,11(4):2028-2035. 被引量:1
  • 4Ozawa J,Yamagiwa T,Hosokawa M,et al.Suppression of very fast transient overvoltage during gas disconnector switching in GIS[J].IEEE Trans on PWRD,1986,1(4):194-201. 被引量:1
  • 5Yanagata Y,Tanaka K,Nishiwaki S,et al.Suppression of VFT in 1 100 kV GIS by adopting resistor-fitted disconnector[J].IEEE Trans on PWRD,1996,11(2):872-880. 被引量:1
  • 6Murayama Y,Kobayashi N,Nishiwaki S,et al.800 kV GIS design and field measurements for transient overvoltage[C].8th International Syrnposium on High Voltage Engineering.Yokohama,Japan,1993:23-27. 被引量:1
  • 7Grandl J,Meppelink J,FrOhlich K,et al.Studies of very fast transients(VFT) in a 765 kV substation[C].International Conference on Large High Voltage Electric Systems.Paris,France,1988. 被引量:1
  • 8国家电网公司.750 kV变电所设计暂行技术规定(电气部分)[S].北京:国家电网公司,2003.. 被引量:1
  • 9Shimoda N,Taguchi K,Nemoto T,et al.Suppression of VFTO across insulating flange of 1100kV GIS.IEE Conference Publication,High Voltage Engineering Symposium,1999,467:415~418. 被引量:1
  • 10Members of CIGRE Working Group 33/13-09.Very fast transient phenomena associated with gas insulated substations.CIGRE,1988,33~53. 被引量:1

共引文献217

同被引文献40

引证文献6

二级引证文献16

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部