期刊文献+

结合价值密度和截止期的网格实时作业调度 被引量:1

Scheduling real-time grid jobs based on value density and relative deadline
下载PDF
导出
摘要 在商业网格和云计算环境中,作业有到达时间、计算量、预算、截止期等参数,其中,预算是时间的函数。准确区分作业的重要性和紧迫性是作业调度系统的一个关键问题。综合利用这四个参数来定义作业的优先级,并提出基于价值密度和相对截止期的网格作业调度算法。分别对弱实时和强实时网格作业的调度进行仿真。仿真结果显示,所提出的调度算法的性能在两种情况下都优于所有对比算法的性能,且在强实时作业情况下优势更明显。 Jobs have arrival time,workload,budget and deadline parameters in economy-based grid computing and cloud computing environment.And the budget parameter changes over time.It is vital to differentiate jobs' importance and urgency exactly for job scheduling system.These four parameters are all taken into account in defining a new priority of jobs here. Based on this priority, a value density and relative deadline jointly based scheduling algorithm is proposed.Results of simulation show that the proposed scheduling algorithm outperforms the referenced algorithms in scheduling of soft and hard realtime grid jobs,especially in the latter.
出处 《计算机工程与应用》 CSCD 北大核心 2010年第24期1-3,21,共4页 Computer Engineering and Applications
基金 国家重点基础研究发展计划(973)(No.2007CB307103) 贵州省重大科技专项计划(黔科合重大专项)(No.【2007】6017)~~
关键词 价值密度 优先级 作业调度 网格计算 实时作业 value density priority job scheduling grid computing real-time job
  • 相关文献

参考文献9

  • 1Aldarmi S A, Burns A.Dynamic value-density for scheduling real- time systems[C]//11th Euromicro Conference on Real-Time Systems.Washington DC:IEEE Computer Society,1999:270-277. 被引量:1
  • 2Buyya R, Murshed M,Abramson D, et al.Scheduling parameter sweep applications on global grids:A deadline and budget constrained cost-time optimization algorithm[J].Software: Practice and Experience(SPE) ,2005,35(5) :491-512. 被引量:1
  • 3Yuan Y, Li X, Wang Q, et al.Cost optimization method for workflows with deadline constraints in grids[C]//11th International Conference on Computer Supported Cooperative Work in Design.Melbourne:IEEE SMC Society,2007:783-788. 被引量:1
  • 4Wang D,Sim K M,Shi B.A deadline and cost constrained optimization algorithm for scheduling applications in grids based on proportional share systems[C]//International Symposium on Electronic Commerce and Security.Washington DC:IEEE Computer Society, 2008 : 46-50. 被引量:1
  • 5王强,徐俊刚,王宏安,戴国忠.一种新的基于优先级表的实时调度算法[J].电子学报,2004,32(2):310-313. 被引量:31
  • 6Pinedo M.调度:原理、算法和系统[M].张智海,译.2版.北京:清华大学出版社,2007:11-15. 被引量:3
  • 7Mu' alem A W, Feitelson D G.Utilization, predictability, workloads, and user runtime estimates in scheduling the IBM SP2 with backfilling[J].IEEE Transactions on Parallel and Distributed Systems, 2001,12 (6) : 529-543. 被引量:1
  • 8Buyya R,Murshed M.GridSim:A toolkit for the modeling and simulation of distributed resource management and scheduling for grid computing[J].The Journal of Concurrency and Computation:Practice and Experience(CCPE) ,2002,14(13/15) :1175-1220. 被引量:1
  • 9Klusacek D,Alea-GridSim based grid scheduling simulator[EB/OL] ( 2010-02-02) [2010-04-03 ].http://www. fi.muni.cz/-xklusac/alea/. 被引量:1

二级参考文献1

共引文献32

同被引文献5

引证文献1

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部