摘要
介绍了TGP206地质超前预报系统的工作原理、解译技术及其在瓦窑坡隧道施工地质超前预报中的应用。通过隧道施工开挖结果验证了预报结果的准确性,展示了TGP206探测系统在隧道施工地质超前的成功预报,减少隧道施工风险,缩短施工工期,更好地指导施工。
The paper introduces the working principles and interpreting technology of TGP206 geological forecasting system and its application in the forecasting in the construction of Wayaopo Tunnel.The excavation of the tunnel verifies the accuracy and success of the forecasting of the system,which has reduced the risks of the construction,shortened the construction time and will be helpful in future construction.