期刊文献+

溢洪道闸墩预应力锚索施工常见问题及对策 被引量:4

Common problems and countermeasures for prestressed cables construction in spillway piers
下载PDF
导出
摘要 列举了巴贡水电站溢洪道闸墩预应力锚索施工中经常碰到的一些问题,如锚索伸长值计算、测力计与千斤顶读数偏差判定、孔道灌浆体强度测定及预埋件安装等,进行分析,给出了解决的办法。 The common questions in the prestressed cables construction in the spillway piers of Bakun Hydropower Station are enumerated.Such as the calculation of the cable elongation,the judgement of the reading tolerance between the load cell and the jeck,the measurement of duct grout cube strength,and the fixing up of embedded parts in place etc.The solutions related to them are described.
作者 杜正宏
出处 《水电与新能源》 2010年第4期42-45,共4页 Hydropower and New Energy
关键词 溢洪道闸墩 预应力锚索 读数偏差 灌浆体强度 spillway pier prestressed cable reading tolerance grout cube strength
  • 相关文献

参考文献5

二级参考文献6

  • 1马来西亚巴贡水电站工程业主招标文件(Employer's Requiremerits - Bakuta Hydroelectric Project, Package CW2 - Main Civil Works, Volume 2 of 7, Books 1 and 2 )[Z]. 马来西亚,2001. 被引量:1
  • 2马来西亚巴贡水电站工程概念设计报告( Bakun Hydroelectric Project, Package CW2 - Main Civil Works, Concept Design Brief,MCHJV (prepared by SDE - NIDRI Consortium ), December 2002) [Z]. 西安:西北勘测设计研究院,2003. 被引量:1
  • 3刘昌,韩建设,杨贤,等.马来西亚巴贡水电站工程地质报告[R].兰州:西北勘测设计研究院,2004. 被引量:1
  • 4巨江,杨纪元,刘少斌,等.马来西亚巴贡水电站1:50溢洪道水工模型试验报告[R].西安:西北勘测设计研究院,2005. 被引量:2
  • 5王康柱,陈炀,卞全.马来西亚巴贡水电站溢洪道设计准则[R].西安:西北勘测设计研究院,2003. 被引量:1
  • 6韩立,孙双科,张志恒,等.马来西亚巴贡水电站溢洪道掺气减蚀设施咨询意见[R].西安:西北勘测设计研究院,2004. 被引量:1

共引文献11