建设项目环境影响后评价是一个新生事物,它的发生和发展需要人员的关注和支持。《中华人民共和国环境影响评价法》是建设项目环境影响后评价的法律依据,建设项目环境影响后评价分为主动后评价和责成后评价,应当在建设项目正常运行阶段,运行负荷会达到设计符合的75%以上进行。建设项目环境影响后评价的主要程序分为准备阶段、评价阶段和报告编制阶段,各阶段均有后评价独特的工作内容和技术要求。据此以污水处理厂后评价为例,沿着评价程序的这一主线,详细介绍了建设项目环境影响后评价各阶段的主要工作内容和技术要求,为规范建设项目环境影响后评价提供思路。
Environment impact post-assessment of construction project is new things,and it's development needs attention and report of people.《Law of the Peoples Republic of China on Evaluation of Environmental Effects》is legal ground of environment impact post-assessment of construction project.Environment impact post-assessment of construction project is classified initiative post-assessment and reproved post-assessment,and it should be carried out in stage of normal operation of construction project,load of running reaching to 75% of design load.Work procedure of it is classified preparation stage、assessment stage and report writing stage,and there are the characteristic tasks and technical requirements in each stage.Hereby take sewage treatment plants for example,along the principal line of work procedure,the main tasks and technical requirements of environment impact post-assessment of construction project are detailedly expounded to present thinking for specifying environment impact post-assessment of construction project.
出处
《环境科学与管理》
CAS
2010年第7期181-187,共7页
Environmental Science and Management
关键词
环境影响后评价
分类
评价时段
工作程序
主要内容
environment impact post-assessment of construction project
classification
time fence
work procedure
the main tasks