摘要
针对现浇预应力混凝土框架结构三种常用施工顺序,分析了各种顺序的施工过程对结构的受力及今后使用产生的影响,阐明各施工顺序对结构的适应程度并给出调整其适应能力的具体方法。
For the 3 kinds of construction orders of casting-in-place prestresed prestressed concrete frame structures, the effect of different construction orders on the member's internal forces and their use in the future is studied.The structural adaptability for each construction order is given herein and some particular methods are given to adjust structural adaptability.
出处
《工业建筑》
CSCD
北大核心
1999年第1期49-51,共3页
Industrial Construction
关键词
预应力混凝土
框架
施工顺序
适应性
prestressed concrete frame construction order adaptability