北京市昌平区南环大桥施工过程仿真分析

Simulation on Construction Process of Beijing Changping Nanhuan Bridge
下载PDF
导出
摘要 北京市昌平区南环大桥为跨径达175m的大跨径钢箱梁自锚式悬索桥,通过对其施工过程进行仿真分析,提出从成桥状态识别主缆无应力长度,进而确定主缆空缆线形及主索鞍塔顶预偏值的方法,以及合理确定吊杆张拉方案的原则,可供桥梁工程技术人员参考。 Beijing Changping Nanhuan Bridge is a 175m-span steel box girder self-anchored suspension bridge. A simulation analysis of the construction process of this bridge is demonstrated. Then a method for identifying the non-stress length of the main cable from the bridge-completion state,and further determining the shape of main cable and the pre-deviation of the main cable saddle tower is put forward. A proper procedure for hanger tension is proposed,which could serve as a reference for bridge engineers.
作者 李浩
出处 《交通标准化》 2010年第13期57-60,共4页 Communications Standardization
关键词 自锚式悬索桥 施工过程 仿真分析 悬链线索单元 无应力长度 self-anchored suspension bridge construction process simulation analysis catenary cable element non-stress length
  • 相关文献

参考文献5

  • 1潘永仁,范立础.悬链线单元在悬索桥主缆下料长度计算中的应用[J].结构工程师,1998,14(3):20-24. 被引量:12
  • 2项海帆..高等桥梁结构理论[M],2001.
  • 3李传习, 夏桂云..大跨度桥梁结构计算理论[M],2002.
  • 4唐茂林..大跨度悬索桥空间几何非线性分析与软件开发[D].西南交通大学,2003:
  • 5杨文爽..大跨度钢管混凝土拱桥无支架缆索吊装系统研究[D].长沙理工大学,2004:

二级参考文献1

共引文献11

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部