摘要
结合工作经验,详细介绍了桥上CRTSⅡ无砟轨道混凝土底座板施工中的张拉过程,工程实践证明:底座板施工中张拉环节非常重要,应加强质量控制,以确保底座板张拉质量符合设计要求。
With the combination of work experience, it introduces the tension process of base plate construction on bridge CRTS Ⅱ track without fraglnents in detail. The project practice proves that: the tension link is very important in base plate construction, so the quality control should be strengthened, so as to ensure the base plate tension quality meets the design requirement.
出处
《山西建筑》
2010年第20期297-299,共3页
Shanxi Architecture
关键词
CRTSⅡ无砟轨道
底座板
张拉
连接方法
CRTS Ⅱ track without fragments, base plate, tension, connection method