摘要
混凝土作为主要工程材料之一,极大地影响着工程的质量和施工成本,由于混凝土的生产、运输、浇注成型的过程环节多,投入的人力、机械比较多,混凝土的损耗是不可避免的,也就造成了从商品混凝土搅拌站发出的混凝土方量与最终混凝土实体方量不一致现象,量差过大会影响混凝土的最终方量结算,使得项目部对混凝土的成本分析失真。
Concrete,as one of the main construction materials,affects the quality of engineering and construction costs greatly.Because there are many connections,such as the production,transport,moulding,and also needs more manpower,machineries,etc. The losses of concrete is inevitable,it can lead an inconsistency between sendout from concrete mixing plant and final volume of concrete physical.Big difference had effect on cost analysis by project department.This article will give you some control views from deep reasons and factors.
出处
《工程机械与维修》
2010年第7期126-126,128,129,共3页
Construction Machinery & Maintenance