通过强夯法在首钢京唐曹妃甸钢铁公司吹填砂地基处理工程中的应用情况和成功经验,对强夯设计、施工参数、加固效果进行了分析,为相似工程提供参考。
Analysis was made on the dynamic consolidation design,construction parameters and reinforcement effects by the application and successful experience of hydraulic fill sand foundation treatment with dynamic compaction method in Shougang Jingtang Caofeidian Steel United Company,which could be the reference for the similar projects.
出处
《探矿工程(岩土钻掘工程)》
2010年第6期67-70,共4页
Exploration Engineering:Rock & Soil Drilling and Tunneling
关键词
吹填砂
强夯法
地基处理
曹妃甸
hydraulic fill sand
dynamic compaction method(DCM)
foundation treatment
Caofeidian