4Stegemann J A, Roy A, Caldwell R J, et al. Understanding Environ mental Leach ability of Electric Arc Furnace Dust [ J]. Journal of Environ mental Engineering,2000 (2) : 112 - 117. 被引量:1
4Liu C P. Kinetics and New Technology in Nonferrous Metallurgy [M].Beijing: Metallurgical Industry Press, 2002. 75-82. 被引量:1
5Antola O, Holappa L, Paschen P. Nickel Ore Reduction by Hydrogen and Carbon Monoxide Containing Gases [J]. Miner. Process. Extr.Metall. Rev., 1995, 15: 169-179. 被引量:1
6Kotzé I J. Pilot Plant Production of Ferronickel from Nickel Oxide Ores and Dusts in a DC Arc Furnace [J]. Miner. Eng., 2002, 15(11):1017-1022. 被引量:1
7Nayak J C. Production of F erro-nickel from Sukinda Laterites in Rotary Kiln-electric Furnace [J]. Trans. Indian Inst. Metall., 1985,38(3): 241-247. 被引量:1
8Watanabe T, Oho S, Arai H, et al. Direct Reduction of Gamierite Ore for Production of Ferronickel with a Rotary Kiln at Nippon Yakin Co.Ltd. Oheyama Works [J]. Int. J. Miner. Process., 1987, 19: 173-187. 被引量:1
9Farren M, Matthew S P, Hayes P C. Reduction of Solid Wustite in H2/H2O/CO/CO2 Gas Mixtures [J]. Metall. Trans. B, 1990, 21B:135-139. 被引量:1
8Steel Statistical Yearbook 2011. Brussels: World Steel Association, 2011. 被引量:1
9Geldenhuis J M A, Home A W. Recovery of valuables and stabili- zation of chrome ( VI ) in stainless steel flue dust fines // 85th Steelmaking Conference. Nashville, 2002 : 661. 被引量:1
10Pelino M, Karamanov A, Pisciella P, et al. Vitrification of elec- tric arc furnace dusts. Waste Manage, 2002, 22(8) : 945. 被引量:1