2Malika V, Jardine A K S. Optimal replacement pol- icy for a general model with imperfect repair [J].Journal of the Operational Research Society. 1992, 43(2) :111-120. 被引量:1
3Seong-Jong Joo. Scheduling preventive maintenance for modulardesigned components: a dynamic ap- proach[J]. European Journal of Operational Re- search, 2009,192(2) : 512-520. 被引量:1
4Lust T, Roux O, Riane F. Exact and heuristic methods for the selective maintenance problem [J]. European Journal of Operational Research, 2009, 192(3):1 166- 1 177. 被引量:1