期刊文献+

爆破整地造林工程的坡地稳定性分析——以太行山低山丘陵区为例 被引量:4

STABILITY ANALYSIS ON MOUNTAIN SLOPE OF SOIL PREPARATION FOR PLANTING BY USING EXPLOSION
下载PDF
导出
摘要 通过典型标准样地调查资料,探讨了造林爆破整地工程的坡地稳定性与降水、地形等因子的相互关系,应用数量化理论Ⅰ,对在有充分降水条件下的低山丘陵区的爆破整地工程损失程度与地形因子之间的关系进行了系统分析,并建立了相应的数学模型,研究指出,充分的前期降水和日最大降雨量是引起爆破整地工程损失的激发因素;影响爆破整地工程稳定性的主要地形因子是地面坡度,其次为坡位、坡向,实施爆破整地工程的地面坡度以不超过25°为宜。 By surveying the sample plot ,the relations between the stability of the mountain slope of soil preparation for planting by using explosion and other factors such as precipitation,terrain, were studied.By using the method of Quantitative Theory I,the interrelation between the damaged degrees of soil preparation programs by using explosion in low mountain area with abundant precipitation and terrain factors was systematically analysed,and the mathematical models related were developed.The results show that the precipitation in early days and the maximum precipitation per day are the primary factors causing the soil preparation program damaged.The main terrain factors of the mountain slope that affect the program stability are according to their importance ,slope ,position and direction.The suitable mountain slope for soil preparation by using explosion is the slope of less than 25°.
出处 《山地学报》 CSCD 1999年第1期59-62,共4页 Mountain Research
基金 国家"九五"科技攻关项目
关键词 爆破整地 稳定性 降水 太行山 造林 坡地稳定 soil preparation by using explosion,stability, precipitation,terrain, quantitative theory Ⅰ
  • 相关文献

参考文献6

二级参考文献10

共引文献24

同被引文献11

引证文献4

二级引证文献12

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部