期刊文献+

地下水石油污染治理的水力截获技术及数值模拟 被引量:41

Hydraulic capture technique for remedy of ground water contaminated by petroleum and its numerical model
下载PDF
导出
摘要 本文首先分析了地下水中石油类污染的时空分布规律,在此基础上,布置了水力截获工程.水力截获带运行后的结果表明,水力截获技术可以去除地下水中的部分石油类污染物.另外,还对水力截获带运行期间地下水中石油类污染物的运移做了数值模拟,特别是对污染源切断前后地下水中石油类污染物的时空分布规律进行了预测.最后,得出如下结论:(1)查清研究区的水文地质条件是布置治理工程的前提,(2)切断污染源是有效治理的关键. The temporal and spatial distributions of petroleum contaminants in ground water are dealt with in this paper. On this basis, hydraulic capture engineering is arranged. The results from running the hydraulic capture wells show the partial petroleum contaminants in groundwater maybe removed out by the hydraulic capture technique. The transport of contaminants during running the hydraulic capture wells is modeled as well. Specially, the temporal and spatial distribution of petroleum contaminants in ground water before and after cut the contaminant sources off is predicted. At last, the conclusions can be come to as follows:1 The prerequisite of arranging remedial engineering is to ascertain the hydrogeological conditions in studied region, 2 The capture zone is an efficient method for the remedy of contaminated fracture karst water.
出处 《水利学报》 EI CSCD 北大核心 1999年第1期71-76,共6页 Journal of Hydraulic Engineering
基金 国家自然科学基金
关键词 地下水 石油污染 水力截获 数值模拟 groundwater, petroleum contamination, hydraulic capture, numerical modeling.
  • 相关文献

参考文献4

  • 1朱学愚,谢春江著..地下水运移模型[M].北京:中国建筑工业出版社,1990:299.
  • 2孙讷正著..地下水污染 数学模型和数值方法[M].北京:地质出版社,1989:361.
  • 3朱学愚,地下水运移模型,1990年 被引量:1
  • 4孙讷正,地下水污染.数学模型和数值方法,1989年 被引量:1

同被引文献568

引证文献41

二级引证文献433

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部