摘要 某在建斜拉桥在悬浇主跨最后一个主梁节段时,发生了斜拉索脆断的偶然事故,形成的冲击荷载引起斜拉桥的剧烈振动。用有限元方法对这一过程进行了非线性数值分析,计算了结构内力和位移的时程响应,动力分析结果表明,斜拉索脆断引起的结构振动对结构安全没有构成威胁。 For some cable-stayed bridge,when the last segment of main span girder is being constructed in the state of cantilever,a brittle fracture of the cable occurred.The impact load caused by this brittle fracture resulted in severe vibration.The non-linear vibration analysis of the bridge in the whole process has been carried out by means of finite element method,and meanwhile the time history responses of structural internal force and displacement has been calculated.Dynamic analysis results show that the peak internal force and displacement,caused by brittle fracture of cable stayed,do not threaten the safety of the bridge.
作者 万信华
出处 《武汉理工大学学报》 CAS CSCD 北大核心 2010年第9期360-363,共4页 Journal of Wuhan University of Technology
关键词 斜拉桥 冲击荷载 振动 非线性分析 时程响应 cable-stayed bridge impact load vibration nonlinear analysis time history response
  • 相关文献

参考文献13

二级参考文献22

  • 1文方针,彭可可.大跨度桥梁非线性计算的空间梁格模型研究[J].华东交通大学学报,2006,23(1):33-36. 被引量:9
  • 2项海帆 陈国强.规范化的人工地震波[J].同济大学学报,1985,4. 被引量:5
  • 3胡聿贤.地震工程学[M].北京:地震出版社,1987.. 被引量:12
  • 4.公路工程抗震设计规范JTJ004-89[S].北京:人民交通出版社,1989.. 被引量:1
  • 5李立峰,中国公路学会桥梁和结构工程学会1995年桥梁学术讨论会论文集,1995年,413页 被引量:1
  • 6肖光宏,中国公路学会桥梁和结构工程学会1995年桥梁学术讨论会论文集,1995年,402页 被引量:1
  • 7颜全胜,博士学位论文,1994年 被引量:1
  • 8程庆国,全国桥梁结构学术大会论文集.下,1992年,929页 被引量:1
  • 9洪显诚,全国桥梁结构学术大会论文集.下,1992年,834页 被引量:1
  • 10李国豪.桥梁结构稳定与振动[M].北京:中国铁道出版社,2002.. 被引量:19

共引文献51

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部