期刊文献+

Dynamic optimization of cutoff grade in underground metal mining 被引量:3

Dynamic optimization of cutoff grade in underground metal mining
下载PDF
导出
摘要 In order to maximize the overall economic gain from a metal mine operation, selection of cutoff grades must consider two important aspects: the time value of money and the spatial variation of the grade distribution in the deposit. That is, cutoff grade selection must be dynamic with respect to both time and space. A newly developed method that fulfills these requirements is presented. In this method, the deposit or a portion of it under study is divided into "decision units" based on the mining method and sample data. The statistical grade distribution and the grade-tonnage relationship of each decision unit are then computed based on the samples falling in the unit. Each decision unit with its grade-tonnage relationship is considered as a stage in a dynamic programming scheme and the problem is solved by applying a forward dynamic programming based algorithm with an objective function of maximizing the overall net present value (NPV). A software package is developed for the method and applied to an underground copper mine in Africa. In order to maximize the overall economic gain from a metal mine operation, selection of cutoff grades must consider two important aspects: the time value of money and the spatial variation of the grade distribution in the deposit. That is, cutoff grade selection must be dynamic with respect to both time and space. A newly developed method that fulfills these requirements is presented. In this method, the deposit or a portion of it under study is divided into "decision units" based on the mining method and sample data. The statistical grade distribution and the grade-tonnage relationship of each decision unit are then computed based on the samples falling in the unit. Each decision unit with its grade-tonnage relationship is considered as a stage in a dynamic programming scheme and the problem is solved by applying a forward dynamic programming based algorithm with an objective function of maximizing the overall net present value (NPV). A software package is developed for the method and applied to an underground copper mine in Africa.
出处 《Journal of Central South University》 SCIE EI CAS 2010年第3期492-497,共6页 中南大学学报(英文版)
基金 Project(50974041) supported by the National Natural Science Foundation of China Project(20090450112) supported by the Postdoctoral Foundation of China Project(20093910) supported by the Natural Science Foundation of Liaoning Province, China
关键词 cutoff grade OPTIMIZATION dynamic programnaing underground metal mining 截止品位 地下金属矿 动态优化 动态规划算法 软件开发方法 时间价值 决策单元 经济收益
  • 相关文献

参考文献5

二级参考文献22

共引文献21

同被引文献26

引证文献3

二级引证文献15

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部