摘要
论述了搞好清障、疏浚及平圩行洪的措施。
This paper stated the measurements of waskouting obstacles,dredging and damaging enclosing dikes in order to control flood and put forword the pattern of controling flood which took the dredging as the important measurement.
出处
《江西水利科技》
1999年第1期33-34,50,共3页
Jiangxi Hydraulic Science & Technology
关键词
河道
清障
疏浚
平圩
退堤
Channel
Washout obstacles
Dredge
Damage enclosing dike
Retreat dike