摘要
根据某工程地下室上浮情况,分析并制定了井点降水和地面堆载方案、解决了地下室上浮问题,并通过精密的测量观察,得出了降水堆载后地下室复原的变化。
In the light of the floating-up of a basement,a scheme of treatment has been proposed by utilizing methods of well-point dewatering and ground surface loading. Through delicate monitoring,recovering of the basement is observed.
出处
《土工基础》
1999年第1期49-51,共3页
Soil Engineering and Foundation
关键词
地下室上浮
井点降水
堆载
basement floating-up,well-point dewatering,surface loading