摘要 在盾构到达施工过程中,盾构机及管片在接近洞门时会出现上浮。从上浮空间、盾构机受力和管片受力三个方面进行的分析结果表明:盾构在下坡段的过量超挖为上浮提供了空间;盾构机在下坡线路中掘进受到向上的合力作用,为盾构机提供了上浮力。通过弹性地基梁法简化计算,分析了管片在浆液中的上浮趋势,提出了盾构、管片上浮的控制措施,保证了盾构的顺利进洞。 It has been found that shield machine and segments tend to float upward on the section approaching shaft in the process of shield driving.Analysis was performed considering the floating space,reaction forces on the shield machine and segments.Results indicated that the floating space was provided due to the over-break and the floating force was due to the shield machine upward reaction received during down-slope driving.Floating was also analysed by method of beam on elastic foundation.Countermeasures for floating of the shield and the segments are proposed to make sure the shield machine reach the portal successfully.
出处 《现代隧道技术》 EI 北大核心 2010年第2期74-77,共4页 Modern Tunnelling Technology
关键词 盾构隧道 盾构到达 上浮 控制措施 冻结法 Shield tunneling Shield approaching Floating Countermeasures Freezing
  • 相关文献

参考文献3

二级参考文献4

共引文献83

同被引文献40

引证文献5

二级引证文献103

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部