摘要
结合具体工程实例,介绍了风积沙路基填筑施工工艺,具体阐述了填筑过程中的每道工序施工方法和操作要点,并提出了对于风积沙路基的防护措施,为类似工程提供了施工经验。
With specific engineerings as examples,it introduces aeolian sand filling technology,and illustrates each construction method of each process and points of operation,and points out protective measures for aeolian sand subgrage,and provides the construction experience for similar engineerings.
出处
《山西建筑》
2010年第15期278-278,共1页
Shanxi Architecture
关键词
风积沙路基
填筑工艺
防护措施
aeolian sand subgrage
filling technology
protective measures