青海电力布局中输煤输电方式选择探讨 被引量:4

Discussion the Coal Handling and Power Transmission Mode in Qinghai Power System Layout
下载PDF
导出
摘要 青海省电力负荷相对集中,主要在西宁、海东,而电源主要分布在南部黄河上游水电集群及北部地区,存在电力流大规模输送问题。随着电力负荷的进一步发展,水电基本在2020年前开发完毕,必须建设一批火电电源,就存在火电电源布局问题,要进行输煤输电比较优选。文章结合青海省现有煤电布局情况,对输煤输电2种方式进行比较分析,提出了青海输煤输电相关建议。 Because of relative concentration,Qinghai electric power load is mainly in Xining,Haidong,and the power distribution utilities is mainly in the south of the Yellow River upper reaches of the cluster and the northern region,therefore there is a large-scale of power flow transmission problem.With the further development of power load,hydropower will complete its development by 2020,thus it needs to build a number of thermal power supply,therefore it exists layout problem of thermal power supply,selection of coal handling and power transmission should be optimized and compared.The paper combining with existing coal handling and power transmission layout of Qinghai province,and makes comparation between coal handling and power transmission,then puts forward related suggestions on Qinghai coal handling and power transmission.
作者 陈昀 刘宁
出处 《青海电力》 2010年第1期8-11,共4页 Qinghai Electric Power
关键词 电力布局 输煤输电 power layout coal handling and power transmission
  • 相关文献

参考文献3

二级参考文献4

  • 1李儒魁,胡炳荣,谭显第.准格尔向东北地区输煤送电比较[R].长春:东北电力设计院,北京:华北电力设计院,1987. 被引量:2
  • 2冯飞,石耀东,杨建龙,等.我国能源输送方式研究[R].北京:国务院发展研究中心.2005. 被引量:2
  • 3国家电网特高压骨干网架总体规划设计[R].北京:国家电网公司.2006. 被引量:1
  • 41000kV级及±800kV级交直流系统技术经济性分析[R].北京:中国电力科学研究院.2005. 被引量:1

共引文献19

同被引文献24

引证文献4

二级引证文献8

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部