摘要
叙述项目材料控制工程师在项目策划/报价、设计、采购和施工不同阶段对材料控制的重点。通过对项目材料控制的策划、统计和日常的监督跟踪,实现项目材料控制的总目标。
The author describes the major points for material control in different phasses of project execution such as project planning ,proposal,design,procurement and construction,through the planning,take off and daily supervision and tracing of project material control,to realize the general target of project material control.
出处
《化工设计》
CAS
1998年第6期52-54,共3页
Chemical Engineering Design